Hi,
so question is already in the header. What is the difference of these options in ARM tool?
Example I have scenario that Role Assingment Approver receives the request and he is supposed to approve 3 roles. He needs to analyze risks, but which option is correct? When he should use Risk Analysis and when Impact Analysis?
Actually, when I am executing these e.g. as an Role Assignment Approver there is no difference in results (10.1 SP08)
SAP has given this instruction below however I do not really get what does it actually mean, any practical example from anyone?