Hi ,

 

Process chain runs at present client are being managed through control-m and each job in control-m is associated to a process chain in BW.

 

I have one meta chain(on which control-m job is based), which is having 5 sub chains in it. If one of the subchain fails, then meta chain is waiting for all other 4 chains to be completed before changing the overall status of meta chain is set to failed. Job in control-m is only set to failed after overall status of meta chain is set to failed, as a result BW support will not be able to be notified as soon as individual sub chai is failed. It is delaying the time to fix the issue, which is also resulting in missing of SLA's.

 

My question, is it possible to set the status of meta chain to failed, immediately after one of it's sub chains is failed (i.e though when other 4 chains are running)?

 

Regards,

Ramesh